Wednesday, 6 March 2013

What each of us did for the project

Alex's job was to build the Aqua zone, this includes getting pond water, a water plant that floats in the water and small water insects.

Leo's Job was to build the Decomposition zone and to bring the dell sticks and base for a stand. In the Decomposition zone we put a very small amount of soil for earthworms and fruit for fruit flies.

Keagan's job was to build the Terra zone and the stand, in the Terra zone we put lots of fertile soil, some compost two tropical plants, earthworms, wood lice and termites.    

No comments:

Post a Comment

Note: only a member of this blog may post a comment.